Beginning Chore List…

Hi Folks!

I just wanted to pass along a list that some of our favorite folk put together for Saturday‘s (4-29, 10am-2pm) workday. This list may get updated Friday night, and I will update it on the website, so please check the website ahead of time. As far as weather goes, it will be updated on the website if we have to postpone. We only postpone if it’s really raining. If it’s just misty / cloudy, we will not postpone.
Please come to the garden prepared to work: 
  • wear sturdy shoes, long pants / sleeves / gloves / apron; 
  • bring hand tools and /or electric tools like cordless drills if you have them. 
  • bring any helpful tools, especially tools that chop, pull, cut, or hold things together. 
But especially bring a good attitude!
————————————————-
Presently the plan is to do the purchasing the evening before the work day, so the truck can be loaded at Home Depot and unloaded at the garden the next morning at the work day, (if weather allows).
Here is a list of the plots needing work:
1- repair
13- repair
15- repair
18- replace plot frame
19-repair
30-repair
33-corners
40-repair
44-replace plot frame
47/48 consult James before repair
51-corners
53B-corners
62-repair
64- replace irregular shaped plot frame
71- corners
74- custom repair
94- repair
105-corners
All participants sign in.
  • Wait Listers are expected to put in 2 hours work before being assigned a plot.
  • Gardeners are advised to wear sturdy footwear, gloves are advised.
  • Bring charged cordless drills to work on building projects.
Suggested Chore List:
  • There are presently no chips to spread., but there are abundant weeds to pull in all pathways, fence line exterior, terrace, and common areas.
  • All weeds are to be bagged in brown leaf bags.
  • Old boards and other wood debris goes out next to the green trash barrel on the ground. The barrel is for trash only.
  • Remove all obstacles from pathways.
  • Chop and compact compost in compost bins, both ends of garden.
  • Tidy/organize shed. (See Kimbly)
  • Prepare and erect new signage.
  • Paint new signs.
See you soon!

Leave a Reply